Browse all practice questions for the Motorola Standards and Guidelines for Communication Sites (R56) Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Motorola Standards and Guidelines for Communication Sites (R56) Practice Test course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Secondary SPD bonding for telco, data, and control circuits shall be bonded using which gauge/length options?
  • Is it permissible to use the entry plate holes for tower light power, building ground, and control cables?
  • Which conductor size is designated as the bus conductor in this standard?
  • Operator Positions often require a bonded SBB.
  • Which site category is described as occasionally prewired and pre-equipped?
  • What is the required ground resistance for a Type A Light Duty Site?
  • What is the required size for the below-ground external grounding conductor?
  • What is the recommended minimum PBB length according to the specs?
  • What is the recommended Tx Line Bonding Distance?
  • Ground Ring Conductor
  • What is the suggested height of coaxial cables to enter facility above facility door?
  • For bonding the Operator Position SBB, what gauge is specified for runs below 10 feet?
  • Which statement BEST describes Histoplasma habitat?
  • What is the minimum gauge for a single item bonding conductor?
  • What size should the single object above-ground external grounding conductor be?
  • What does energy coupling describe regarding distance?
  • Safety Kits shall include acid resistant bib type apron, acid resistant full-face shield, acid resistant gloves, acid neutralizing compound, and non-expired eye wash solution.
  • For bonding the Operator Position SBB, what gauge is specified for runs below 13 feet?
  • Ground rods shall be installed closer or farther than 6 feet apart?
  • Each transmitter should have which three protections?
  • What is the minimum SBB height specified in the standards?
  • Which conductor size is designated as the single item bonding conductor in this standard?
  • Is the statement 'Each leg of a self-supporting tower should be bonded using a #6 AWG conductor' true or false?
  • Which bonding feature is installed in all equipment shelters/rooms for perimeter bonding?
  • Ground rods shall be made of copper-clad steel, solid copper, hot-dipped galvanized steel or stainless steel. True or False?
  • Bare Conductors shall be supported in what fashion?
  • SBB stands for which term in the grounding and bonding standards?
  • PDU stands for Power Distribution Unit.
  • Which systems must be bonded to the grounding electrode system?
  • How should ground rods be spaced relative to each other?
  • Generators are required to be equipped with which alarms?
  • What is the minimum diameter of a ground rod?
  • Objectionable Current is defined as which of the following?
  • Which site category houses communications equipment and related systems only and can be fully or partially buried?
  • Outer shields of Telco Cables serving the Operator Position shall be bonded using which gauge/length options?
  • What does SPD stand for in electrical protection terminology?
  • How many extension blocks or receptacle strips are allowed on the same branch circuit?
  • IPBB Height is typically at what height?
  • Receptacle strips are allowed to have an ON/OFF switch provided the switch is covered.
  • What is the minimum conductor size for the PBB?
  • Minimum fiber bending radius equals 10 times the diameter. If diameter is 0.25 inches, what is the radius?
  • What is the purpose of the Bonding Backbone Conductor?
  • Distance Ratio Squared describes the energy coupling into a building as distance changes.
  • Class I Lighting Protection System (LPS) requires a #2 AWG Copper down conductor.
  • Which option is NOT listed as a major SPD site entrance?
  • Is a site with no tower considered exposed to lightning?
  • Histoplasma is described as a fungus that lives in which environment?
  • Breakers and receptacles have to be labeled and correlated at the panel.
  • What is the required connecting method for grounding electrode conductors?
  • Which bonding method should be used for tower structure ground conductors unless directed otherwise by the manufacturer?
  • How should unused ports in the entry plate be sealed?
  • Which measurement corresponds to working space height?
  • Which option correctly lists a component that is included in site safety kits?
  • Bonding Backbone Conductor extends through building connecting which components?
  • What is the interior lighting minimum?
  • Type 3 SPDs, PDUs, and UPS Chassis do require bonding to the Operator Position SBB.
  • For Operator Position SBB bonding, which gauge is specified for runs under 13 feet?
  • How far from the PBB does an RF Tx Cable entry have to be to require an Entry Point SBB?
  • What is the maximum distance allowed between ground rods placed at corners?
  • When solar panels are used, batteries should be able to power the site for how long without wind or solar?
  • Concrete Reinforcing Steel, Water Pipe Systems, Metallic Pathways, or Conduits SHALL NOT be used as a bonding backbone conductor.
  • Which site category is intended to house only communication equipment and related systems and is sometimes prewired?
  • Stainless Steel Hardware Series used unless specified.
  • PBB stands for Primary Bonding Bar.
  • Which statement about building-entry bonding is correct?
  • What size is specified for multiple objects of above-ground external grounding conductors?
  • Which site category is suitable for temporary human occupancy during equipment installation and maintenance?
  • For monopole towers, how many grounding conductors of #2 AWG copper are required?
  • Ice Bridge Grounding: Which combination of gauges is specified for grounding and bonding the ice bridge respectively?
  • The 66 Block is categorized as which type of component?
  • What gauge conductor should be used to bond each leg of a self-supporting tower?
  • What is the minimum depth below finished grade for a ground rod?
  • What is the cable and conductor securing interval?
  • Bonding Jumpers are typically what gauge and maximum length?
  • Which statement best describes a Type B Standard Duty Site?
  • Should the DC Power System be installed closest or farthest to the PBB?
  • For #6 AWG bonding conductor, what is the length range?
  • What are the requirements for Tower Ground Bus Bars?
  • Where should Conductive Anti Oxidant Compound be used?
  • What jacket/marking options are acceptable for interior bonding/grounding conductors?
  • Which statement is correct about bonding in the context of Separately Derived Systems?
  • What is the minimum separation between the top of the cable tray and the ceiling?
  • IPBB stands for what?
  • Hanta Virus is described as a dangerous respiratory illness related to Ebola. How is it contracted and what is its approximate mortality rate?
  • LPS stands for Lighting Protection System.
  • GES stands for Grounding Electrode System.
  • Which statement best describes the placement of the DC Power System relative to the PBB?
  • Which statement best describes the bending and routing requirements for grounding conductor runs?
  • Ground rods must be buried to satisfy which condition?
  • What material is recommended for guy wiring bonding?
  • Generators are required to be equipped with Engine High Temp Alarm/Shutdown and Low Oil Pressure Alarm/Shutdown.
  • What is the minimum thickness required for the External Ground Bus Bar?
  • For side-mounted antennas, a single ground conductor may be used, but two down conductors are recommended when practical.
  • What compound is used for bonding tinned connections to steel, galvanized steel, or aluminum?
  • Rooftop conductor bonding methods include exothermic, irreversible or other fittings listed for use in Lighting Protection Systems (LPS).
  • Communication wires can be attached to electrical conduit or raceways. True or False?
  • What material should be used for Tower Ground Bus Bars when not protected against precipitation runoff?
  • If the PBB is not located in the equipment room, where should the cable tray be bonded?
  • How far should ground rods be spaced?
  • What is the minimum separation between the top of the equipment rack and the bottom of the cable tray?
  • In a DC plant, what gauge must the SBB to PBB connection use?
  • IPBB Requirements include what?
  • Supplementary Bonding Network/Grid uses what gauge? Can flat be used?
  • Which of the following is a correct pairing of AWG size and its maximum length?
  • Ice Bridge Grounding: The bridge should be bonded to each support post using which gauge?
  • What is the minimum height above grade that grounding conductors must be protected?
  • Which bonding methods are allowed for the Tower Ground Bus Bar?
  • Detachable Cabinet Doors or other detachable metallic objects use which gauge for bonding?
  • How should the wire mesh be secured?
  • What is the minimum size for an equipment bonding conductor?
  • Which statement best describes ground rod placement?
  • For #1 AWG bonding conductor, what is the length range?
  • What is the minimum wire size for a multiple-line SPD?
  • What is the minimum distance for grounding metallic objects relative to the external grounding electrode system?
  • In high lightning areas, what conductor size is recommended for the PBB?
  • What is the preferred shape and approximate size for the Single Point Entry Window area?
  • What is the required depth for the radial grounding conductor?
  • External Ground Bus Bar requirements specify what characteristics?
  • What is used to bond detachable metallic parts of equipment cabinets?
  • What is the target ground resistance for a Type B2 Extra Duty Site?
  • Separately Derived Systems shall be bonded on the secondary side of the unit.
  • Which site category contains communications equipment and related support systems and is suitable for temporary human occupancy during equipment install and maintenance?
  • Which set describes the transmitter protections correctly?
  • Distance from a structural expansion connector to the adjacent side where a support shall be located?
  • Which AWG size corresponds to a length of 53-66 ft?
  • Within how many inches of the RF line entrance should the PBB be located?
  • What is the Vault site category used for?
  • What is the specified length for #1/0 AWG conductors?
  • In metallic conduit, conductors should be jacketed.
  • The primary purpose of bonding all equipment together is to reduce or eliminate a potential difference between conductive materials.
  • MRPLPR stands for Main Roof Perimeter Lighting Protection Ring.
  • What is the proper separation between service conductors and Tx lines?
  • Which bonding method is allowed for PBB connections?
  • A generator is considered Separately Derived System when the Automatic Transfer Switch breaks the neutral conductor.
  • What fire extinguishers are required on site?
  • What is the minimum vertical clearance from the top of the cable tray to the ceiling?
  • There shall be only one grounding electrode system, and all metallic items shall be bonded to it. True or False?
  • The BackBone Bonding Conductor bonds what?
  • Site Category: Building is defined as a permanent structure on foundation, suitable for human occupancy and contains equipment.
  • The working space must allow cabinet doors to be opened to 90 degrees.
  • Which of the following accurately describes conductors in drop ceilings?
  • Interior bonding/grounding conductors must be kept a minimum distance from other cables and connectors, except at which location?
  • For #2 AWG bonding conductor, what is the length range?
  • What is the required distance from a tower for the ground ring?
  • Site Category: Shelter is defined as a permanent structure on foundation, contains communications equipment and related support systems, and is suitable for temporary human occupancy during maintenance.
  • Which conductor size is used to bond the ground rod to the cabinet?
  • To bond the SBB to the PBB, what copper gauge is specified?
  • What is the minimum working space width?
  • What is the minimum bending radius specified for grounding conductor runs?
  • What is the minimum PBB height specified in the standards?
  • Which of the following is a valid major SPD site entrance?
  • Within 24 inches of building entry, alarm circuits terminate to which device?
  • UPS stands for Uninterruptible Power Supply.
  • What is the cabinet ground ring distance from the foundation?
  • Class II LPS is applicable when the building exceeds 75 feet in height.
  • If fiber diameter is 0.3 inches, what is the minimum bending radius?
  • Underground water pipe can serve as grounding electrode if in direct contact with earth for how many feet?
  • Concrete Encased Electrode requirements specify how much concrete encasement?
  • Single Point Grounding is the concept of bonding all equipment to a common point, commonly PBB.
  • Bonding conductors ______ decrease in size as the bonding path moves closer to the termination point of the GES.
  • For #3 AWG bonding conductor, what is the length range?
  • What is the specified length for #2/0 AWG conductors?
  • What is the target ground resistance for a Type B Standard Duty Site?
  • What is the required working space height?
  • Ground plates shall be made of what materials?
  • Class I LPS requires the building height not to exceed 75 feet.
  • What is the minimum length of a ground rod?
  • For #4 AWG bonding conductor, what is the length range?
  • Government and Local Code take precedence over R56.
  • Which materials are acceptable for the grounding wire mesh?
  • What is the maximum recommended PBB conductor length and splice condition?
  • What does SPD stand for in this context?
  • Within 2 feet of the grounding down conductor, consistent AWG size should be used to the MRPLPR.
  • The 24 inch measurement is used to determine which practice?
  • Site Category: Cabinet/Enclosure is defined as housing communication equipment and related systems only, and is occasionally prewired and pre-equipped.
  • How many Neutral to Ground bonds are allowed?
  • What is the required distance from a building for the ground ring?
  • Which material SHALL NOT be used as a bonding backbone conductor?
  • Which statement correctly describes detachable metallic objects bonding?
  • IPBB support requirements specify clearance from wall and spacing.
  • What is the specified length for #4/0 AWG conductors?
  • What is the PBB thickness as specified?
  • Interior bonding/grounding conductors are made of which material by default, unless another material is specified?
  • In lightning prone locations, which conductor size should be considered?
  • How deep must ground rods be buried below finished grade?
  • What is the minimum Size for Single Line SPD?
  • Generator grounding: Additional ground rod is needed if the generator is more than how many feet from the building?
  • Conductors should be supported at what interval in cable tray?
  • BackBone Bonding Conductor bonds multiple Bonding Backbone Conductors.
  • Which disease is contracted by human contact with rodent waste and has about 50% mortality?
  • Raised Floor Conductor Securing on pedestal must be at least at what interval?
  • At what angle should bonding conductors cross other cables?
  • Are split bolt connections allowed for grounding connections?
  • Which AWG size corresponds to a length of 67-84 ft?
  • Ground plates thickness
  • Where should all utility entrances be located?
  • Conductors shall be secured at no greater than how many feet?
  • What is the minimum ceiling height when using 7.5ft racks?
  • Which statement most accurately describes a ground ring conductor?
  • Cables should be supported when spanning beyond what distance?
  • What grid size is specified for the grounding wire mesh?
  • Which of the following is a major SPD site entrance?
  • How many grounding rods are recommended to meet the grounding goal?
  • Which of the following items must be bonded to the Operator Position SBB?
  • Connection between Building Ground Ring and Tower Ground Ring
  • What is the minimum conductor gauge for a bus conductor in this practice?
  • Type B2 Extra Duty Site is best described as which of the following?
  • Under-floor cable trays can be bonded to which grid if present?
  • Rooftop Communications Shelters shall contain an Internal Bonding and Grounding System (IBGS).
  • Which statement about raised floor securing is correct?
  • What does RBB stand for in the context of site bonding?
  • What minimum gauge is recommended for bonding jumpers for detachable metallic parts of equipment cabinets?
  • Raised Floor Conductor Securing when placed directly on sub floor must be at intervals no greater than?
  • Ice Bridge Grounding: Each support must be grounded using which gauge copper?
  • Which materials are acceptable for ground plates?
  • Ground rods not driven straight down or at 45 degrees need to be buried horizontally how deep?
  • Which site category is used for support communications equipment?
  • The first disconnecting means is the location where the Neutral-to-Ground bond is permissible.
  • Rooftop tower bonding to the Main Roof Perimeter Lighting Protection Ring requires at least two opposing conductors.
  • For Operator Position SBB bonding, which gauge is specified for runs under 10 feet?
  • Which insulation requirement applies to the PBB?
  • Should grounding conductors be allowed to daisy chain in this setup?
  • What is the minimum working space depth?
  • Where should line bonding at a building entry be placed?
  • For grounding electrode conductors, which splicing methods are permitted?
  • What is the required depth for the grounding wire mesh?
  • Where is the concrete encasement located for a concrete encased electrode?
  • Reducing the height at which RF Tx lines leave the tower and enter the building will reduce the susceptibility of lightning damage.
  • Increasing the distance between tower and building will raise or reduce the susceptibility of damage due to the lightning?
  • Is R56 a Motorola proprietary standard?
  • What is the specified length for #3/0 AWG conductors?
  • Tower Ground Bus Bars must be installed in relation to communication cable ground kits how?
  • The strengthening requirement for the ring connections is to use copper in at least how many points between Building Ground Ring and Tower Ground Ring?
Subscribe

Get the latest from Examzify