  • Class I Lighting Protection System (LPS) requires a #2 AWG Copper down conductor.
  • Which option is NOT listed as a major SPD site entrance?
  • What is the suggested height of coaxial cables to enter facility above facility door?
  • What is the minimum thickness required for the External Ground Bus Bar?
  • Which statement about building-entry bonding is correct?
  • What is the required depth for the grounding wire mesh?
  • What is the minimum gauge for a single item bonding conductor?
  • Ice Bridge Grounding: Which combination of gauges is specified for grounding and bonding the ice bridge respectively?
  • The 24 inch measurement is used to determine which practice?
  • Which statement is correct about bonding in the context of Separately Derived Systems?
  • Distance Ratio Squared describes the energy coupling into a building as distance changes.
  • What is the minimum separation between the top of the equipment rack and the bottom of the cable tray?
  • Should grounding conductors be allowed to daisy chain in this setup?
  • Which of the following accurately describes conductors in drop ceilings?
  • BackBone Bonding Conductor bonds multiple Bonding Backbone Conductors.
  • The BackBone Bonding Conductor bonds what?
  • PDU stands for Power Distribution Unit.
  • Where should Conductive Anti Oxidant Compound be used?
  • What is used to bond detachable metallic parts of equipment cabinets?
  • Which conductor size is designated as the single item bonding conductor in this standard?
  • What does SPD stand for in electrical protection terminology?
  • What does energy coupling describe regarding distance?
  • Breakers and receptacles have to be labeled and correlated at the panel.
  • Ice Bridge Grounding: The bridge should be bonded to each support post using which gauge?
  • Which statement best describes a Type B Standard Duty Site?
  • Secondary Neutral-to-Ground bonds are allowed only with a Separately Derived Power Source.
  • Minimum fiber bending radius equals 10 times the diameter. If diameter is 0.25 inches, what is the radius?
  • What is the minimum vertical clearance from the top of the cable tray to the ceiling?
  • Is a site with no tower considered exposed to lightning?
  • For grounding electrode conductors, which splicing methods are permitted?
  • Class II Lighting Protection System (LPS) requires a #2/0 AWG Copper down conductor.
  • Communication wires can be attached to electrical conduit or raceways. True or False?
  • Which length range applies to a #2 AWG bonding conductor?
  • Should the DC Power System be installed closest or farthest to the PBB?
  • Ground rods shall be made of copper-clad steel, solid copper, hot-dipped galvanized steel or stainless steel. True or False?
  • What is the required ground resistance for a Type A Light Duty Site?
  • Concrete Reinforcing Steel, Water Pipe Systems, Metallic Pathways, or Conduits SHALL NOT be used as a bonding backbone conductor.
  • UPS stands for Uninterruptible Power Supply.
  • Tower Ground Bus Bars must be installed in relation to communication cable ground kits how?
  • For Operator Position SBB bonding, which gauge is specified for runs under 13 feet?
  • Underground water pipe can serve as grounding electrode if in direct contact with earth for how many feet?
  • Bonding conductors ______ decrease in size as the bonding path moves closer to the termination point of the GES.
  • Are split bolt connections allowed for grounding connections?
  • What is the required distance from a tower for the ground ring?
  • What is the required connecting method for grounding electrode conductors?
  • Is R56 a Motorola proprietary standard?
  • Within 24 inches of building entry, alarm circuits terminate to which device?
  • Ground plates thickness
  • What is the proper separation between service conductors and Tx lines?
  • Which statement best describes the bending and routing requirements for grounding conductor runs?
  • Which statement about raised floor securing is correct?
  • Objectionable Current is defined as which of the following?
  • Within 2 feet of the grounding down conductor, consistent AWG size should be used to the MRPLPR.
  • Which statement best describes the placement of the DC Power System relative to the PBB?
  • What is the minimum conductor size for the PBB?
  • Which bonding feature is installed in all equipment shelters/rooms for perimeter bonding?
  • A generator is considered Separately Derived System when the Automatic Transfer Switch breaks the neutral conductor.
  • Which insulation requirement applies to the PBB?
  • What is the required working space height?
  • In metallic conduit, conductors should be jacketed.
  • For Operator Position SBB bonding, which gauge is specified for runs under 10 feet?
  • Where is the concrete encasement located for a concrete encased electrode?
  • Where should line bonding at a building entry be placed?
  • For #6 AWG bonding conductor, what is the length range?
  • There shall be only one grounding electrode system, and all metallic items shall be bonded to it. True or False?
  • Which AWG size corresponds to a length of 53-66 ft?
  • Within how many inches of the RF line entrance should the PBB be located?
  • Which statement best describes ground rod placement?
  • What jacket/marking options are acceptable for interior bonding/grounding conductors?
  • What is the minimum working space width?
  • What gauge conductor should be used to bond each leg of a self-supporting tower?
  • Which materials are acceptable for ground plates?
  • What is the specified length for #3/0 AWG conductors?
  • What are the grounding conductor protection requirements?
  • Conductors shall be secured at no greater than how many feet?
  • SBB stands for which term in the grounding and bonding standards?
  • Which of the following is a valid major SPD site entrance?
  • What is the PBB thickness as specified?
  • LPS stands for Lighting Protection System.
  • Safety Kits shall include acid resistant bib type apron, acid resistant full-face shield, acid resistant gloves, acid neutralizing compound, and non-expired eye wash solution.
  • What is the maximum distance allowed between ground rods placed at corners?
  • What size should the single object above-ground external grounding conductor be?
  • Which systems must be bonded to the grounding electrode system?
  • What is the recommended Tx Line Bonding Distance?
  • Distance from a structural expansion connector to the adjacent side where a support shall be located?
  • What is the Vault site category used for?
  • What is the specified length for #2/0 AWG conductors?
  • Which bonding methods are allowed for the Tower Ground Bus Bar?
  • How deep must ground rods be buried below finished grade?
  • Raised Floor Conductor Securing when placed directly on sub floor must be at intervals no greater than?
  • For #4 AWG bonding conductor, what is the length range?
  • To bond the SBB to the PBB, what copper gauge is specified?
  • What is the purpose of the Bonding Backbone Conductor?
  • What are the requirements for Tower Ground Bus Bars?
  • Increasing the distance between tower and building will raise or reduce the susceptibility of damage due to the lightning?
  • Which conductor size is used to bond the ground rod to the cabinet?
  • What is the minimum length of a ground rod?
  • Secondary SPD bonding for telco, data, and control circuits shall be bonded using which gauge/length options?
  • What size is specified for multiple objects of above-ground external grounding conductors?
  • What grid size is specified for the grounding wire mesh?
  • Hanta Virus is described as a dangerous respiratory illness related to Ebola. How is it contracted and what is its approximate mortality rate?
  • Which option correctly lists a component that is included in site safety kits?
  • What is the minimum working space depth?
  • Histoplasma is described as a fungus that lives in which environment?
  • Which set describes the transmitter protections correctly?
  • Class II LPS is applicable when the building exceeds 75 feet in height.
  • Bonding Jumpers are typically what gauge and maximum length?
  • When solar panels are used, batteries should be able to power the site for how long without wind or solar?
  • What is the minimum SBB height specified in the standards?
  • For #3 AWG bonding conductor, what is the length range?
  • Ground rods not driven straight down or at 45 degrees need to be buried horizontally how deep?
  • Site Category: Building is defined as a permanent structure on foundation, suitable for human occupancy and contains equipment.
  • MRPLPR stands for Main Roof Perimeter Lighting Protection Ring.
  • IPBB Height is typically at what height?
  • GES stands for Grounding Electrode System.
  • At what angle should bonding conductors cross other cables?
  • IPBB stands for what?
  • In lightning prone locations, which conductor size should be considered?
  • What is the specified length for #1/0 AWG conductors?
  • What material should be used for Tower Ground Bus Bars when not protected against precipitation runoff?
  • PBB stands for Primary Bonding Bar.
  • Which site category is used for support communications equipment?
  • What is the minimum height above grade that grounding conductors must be protected?
  • Which AWG size corresponds to a length of 67-84 ft?
  • Which conductor size is designated as the bus conductor in this standard?
  • What is the maximum recommended PBB conductor length and splice condition?
  • Which bonding method is allowed for PBB connections?
  • Outer shields of Telco Cables serving the Operator Position shall be bonded using which gauge/length options?
  • What is the required distance from a building for the ground ring?
  • Interior bonding/grounding conductors must be kept a minimum distance from other cables and connectors, except at which location?
  • Which site category contains communications equipment and related support systems and is suitable for temporary human occupancy during equipment install and maintenance?
  • How many Neutral to Ground bonds are allowed?
  • Interior bonding/grounding conductors are made of which material by default, unless another material is specified?
  • Generators are required to be equipped with which alarms?
  • Stainless Steel Hardware Series used unless specified.
  • Ice Bridge Grounding: Each support must be grounded using which gauge copper?
  • How should ground rods be spaced relative to each other?
  • What is the minimum distance for grounding metallic objects relative to the external grounding electrode system?
  • What compound is used for bonding tinned connections to steel, galvanized steel, or aluminum?
  • What is the interior lighting minimum?
  • Supplementary Bonding Network/Grid uses what gauge? Can flat be used?
  • Where should all utility entrances be located?
  • Generator grounding: Additional ground rod is needed if the generator is more than how many feet from the building?
  • Single Point Grounding is the concept of bonding all equipment to a common point, commonly PBB.
  • What is the minimum PBB height specified in the standards?
  • Raised Floor Conductor Securing on pedestal must be at least at what interval?
  • Each transmitter should have which three protections?
  • For monopole towers, how many grounding conductors of #2 AWG copper are required?
  • IPBB Requirements include what?
  • The first disconnecting means is the location where the Neutral-to-Ground bond is permissible.
  • How should unused ports in the entry plate be sealed?
  • What fire extinguishers are required on site?
  • For bonding the Operator Position SBB, what gauge is specified for runs below 13 feet?
  • What is the minimum depth below finished grade for a ground rod?
  • Site Category: Shelter is defined as a permanent structure on foundation, contains communications equipment and related support systems, and is suitable for temporary human occupancy during maintenance.
  • The primary purpose of bonding all equipment together is to reduce or eliminate a potential difference between conductive materials.
  • What is the minimum ceiling height when using 7.5ft racks?
  • Separately Derived Systems shall be bonded on the secondary side of the unit.
  • Type 3 SPDs, PDUs, and UPS Chassis do require bonding to the Operator Position SBB.
  • Detachable Cabinet Doors or other detachable metallic objects use which gauge for bonding?
  • For #2 AWG bonding conductor, what is the length range?
  • Receptacle strips are allowed to have an ON/OFF switch provided the switch is covered.
  • How far should ground rods be spaced?
  • Which of the following items must be bonded to the Operator Position SBB?
  • In high lightning areas, what conductor size is recommended for the PBB?
  • Generators are required to be equipped with Engine High Temp Alarm/Shutdown and Low Oil Pressure Alarm/Shutdown.
  • How should the wire mesh be secured?
  • Ground rods shall be installed closer or farther than 6 feet apart?
  • For #1 AWG bonding conductor, what is the length range?
  • Bare Conductors shall be supported in what fashion?
  • What is the preferred shape and approximate size for the Single Point Entry Window area?
  • Rooftop Communications Shelters shall contain an Internal Bonding and Grounding System (IBGS).
  • What minimum gauge is recommended for bonding jumpers for detachable metallic parts of equipment cabinets?
  • What is the minimum conductor gauge for a bus conductor in this practice?
  • Connection between Building Ground Ring and Tower Ground Ring
  • What is the minimum bending radius specified for grounding conductor runs?
  • How many extension blocks or receptacle strips are allowed on the same branch circuit?
  • What is the specified length for #4/0 AWG conductors?
  • What is the minimum diameter of a ground rod?
  • Which site category houses communications equipment and related systems only and can be fully or partially buried?
  • The 66 Block is categorized as which type of component?
  • Is the statement 'Each leg of a self-supporting tower should be bonded using a #6 AWG conductor' true or false?
  • Which statement BEST describes Histoplasma habitat?
  • Government and Local Code take precedence over R56.
  • External Ground Bus Bar requirements specify what characteristics?
  • In a DC plant, what gauge must the SBB to PBB connection use?
  • What material is recommended for guy wiring bonding?
  • Is it permissible to use the entry plate holes for tower light power, building ground, and control cables?
  • Reducing the height at which RF Tx lines leave the tower and enter the building will reduce the susceptibility of lightning damage.
  • Class I LPS requires the building height not to exceed 75 feet.
  • Cables should be supported when spanning beyond what distance?
  • What is the minimum Size for Single Line SPD?
  • Which measurement corresponds to working space height?
  • Bond additional fence posts to limit the distance between bonded posts to 40 ft. True or False?
  • Conductors should be supported at what interval in cable tray?
  • Concrete Encased Electrode requirements specify how much concrete encasement?
  • Which of the following is a major SPD site entrance?
  • Which site category is described as occasionally prewired and pre-equipped?
  • What is the minimum size for an equipment bonding conductor?
  • Rooftop tower bonding to the Main Roof Perimeter Lighting Protection Ring requires at least two opposing conductors.
  • What is the required size for the below-ground external grounding conductor?
  • Bonding Backbone Conductor extends through building connecting which components?
  • Ground plates shall be made of what materials?
  • IPBB support requirements specify clearance from wall and spacing.
  • Ground Ring Conductor
  • Ground rods must be buried to satisfy which condition?
  • What is the bend radius specified for the ground ring?
  • For bonding the Operator Position SBB, what gauge is specified for runs below 10 feet?
  • What is the cabinet ground ring distance from the foundation?
  • The strengthening requirement for the ring connections is to use copper in at least how many points between Building Ground Ring and Tower Ground Ring?
  • Which statement most accurately describes a ground ring conductor?
  • Which disease is contracted by human contact with rodent waste and has about 50% mortality?
  • Which bonding method should be used for tower structure ground conductors unless directed otherwise by the manufacturer?
  • How far from the PBB does an RF Tx Cable entry have to be to require an Entry Point SBB?
  • What is the target ground resistance for a Type B Standard Duty Site?
  • Which materials are acceptable for the grounding wire mesh?
  • Which statement correctly describes detachable metallic objects bonding?
  • Under-floor cable trays can be bonded to which grid if present?
  • Which material SHALL NOT be used as a bonding backbone conductor?
  • What does SPD stand for in this context?
  • The working space must allow cabinet doors to be opened to 90 degrees.
  • Which site category is intended to house only communication equipment and related systems and is sometimes prewired?
  • Type B2 Extra Duty Site is best described as which of the following?
  • Which of the following is a correct pairing of AWG size and its maximum length?
  • What does RBB stand for in the context of site bonding?
  • What is the cable and conductor securing interval?
  • How many grounding rods are recommended to meet the grounding goal?
  • What is the minimum separation between the top of the cable tray and the ceiling?
  • What is the target ground resistance for a Type B2 Extra Duty Site?
  • What is the required depth for the radial grounding conductor?
  • Operator Positions often require a bonded SBB.
  • Rooftop conductor bonding methods include exothermic, irreversible or other fittings listed for use in Lighting Protection Systems (LPS).
  • Which site category is suitable for temporary human occupancy during equipment installation and maintenance?
  • If fiber diameter is 0.3 inches, what is the minimum bending radius?
  • If the PBB is not located in the equipment room, where should the cable tray be bonded?
  • What is the recommended minimum PBB length according to the specs?
  • For side-mounted antennas, a single ground conductor may be used, but two down conductors are recommended when practical.
  • What is the minimum wire size for a multiple-line SPD?
  • Site Category: Cabinet/Enclosure is defined as housing communication equipment and related systems only, and is occasionally prewired and pre-equipped.